A crane lowers the Shuttle Radar Topography Mission (SRTM), the primary payload on STS-99, into the payload bay of the orbiter Endeavour in Orbiter Processing Facility (OPF) bay 2. The SRTM consists of a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation. The SRTM hardware includes one radar antenna in the Shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) from the shuttle. STS-99 is scheduled to launch Sept. 16 at 8:47 a.m. from Launch Pad 39A. (Photo Release Date: 07/21/1999 )

KSC-99PP-0973 - Raw ASCII Text Caption file
KSC-99PP-0973 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-99PP-0973 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-99PP-0973 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-99 KSC Photo IndexNext Image KSC-99PP-0974


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)