KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis inches its way out the doors of the Vehicle Assembly Building as it begins rolling out to Launch Pad 39A for the second time. An attempt to roll out on Jan. 2 incurred a failed computer processor on the crawler transporter and the Shuttle was returned to the Vehicle Assembly Building using a secondary computer processor on the vehicle. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station, carrying the U.S. Laboratory, named Destiny. The lab will have five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five. (Photo Release Date: 01/03/2001 )

KSC-01PP-0012 - Raw ASCII Text Caption file
KSC-01PP-0012 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-01PP-0012 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-01PP-0012 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-98 KSC Photo IndexNext Image KSC-01PP-0013


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)