The payload transport canister (right) and workers wait for the arrival of the P6 integrated truss segment (left) carried by the overhead crane. After being placed in the canister, the truss will be transported to Launch Pad 39B and the payload changeout room. Then it will be moved into Space Shuttle Endeavour’s payload bay for mission STS-97. The P6 comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. The STS-97 launch is scheduled Nov. 30 at 10:06 p.m. EST. (Photo Release Date: 11/10/2000 )

KSC-00PP-1688 - Raw ASCII Text Caption file
KSC-00PP-1688 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-00PP-1688 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-00PP-1688 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-97 KSC Photo IndexNext Image KSC-00PP-1689


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)