The International Space Station ground operations officially turn over the P6 Integrated Truss Structure to the NASA shuttle integration team in a ceremony in the Space Station Processing Facility. A symbolic key is presented to Brent Jett (at left), commander on mission STS-97, which is taking the P6 to the International Space Station. Next to him are (left to right) Bill Dowdell, mission manager; Mark Sorensen, outboard truss cargo element manager for Boeing; and John Elbon, Boeing ISS director of ground operations at KSC. Among the attendees at left watching the ceremony are other STS-97 crew members (in uniform, from left) Mission Specialists Joe Tanner and Carlos Noriega and Pilot Mike Bloomfield. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission involves two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST. (Photo Release Date: 11/07/2000 )

KSC-00PP-1662 - Raw ASCII Text Caption file
KSC-00PP-1662 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-00PP-1662 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-00PP-1662 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-97 KSC Photo IndexNext Image KSC-00PP-1663


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)