Space Shuttle Endeavour approaches the incline to Launch Pad 39B, where the Rotating and Fixed Service Structures can be seen in the background to the left. Moments after this photo was taken, workers noticed one of the crawler-transporter cleats was cracked and rollout was delayed until the cleat could be replaced. The Space Shuttle was hard down on the pad several hours later. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. (Photo Release Date: 10/31/2000 )

KSC-00PP-1627 - Raw ASCII Text Caption file
KSC-00PP-1627 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-00PP-1627 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-00PP-1627 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-97 KSC Photo IndexNext Image KSC-00PP-1628


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)