The crawler transporter, with its cargo of Space Shuttle Discovery and mobile launcher platform, leaves tracks on the crawlerway as it makes its way up Launch Pad 39B. Behind the Shuttle can be seen part of the rotating service structure and the 82-foot lightning mast (next to the solid rocket booster) on top of the fixed service structure. The two structures are used during prelaunch preparations at the pad. . Mission STS-96, the 94th launch in the Space Shuttle Program, is scheduled for liftoff May 27 at 6:48 a.m. EDT. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment. (Photo Release Date: 05/20/1999 )

KSC-99PP-0566 - Raw ASCII Text Caption file
KSC-99PP-0566 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-99PP-0566 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-99PP-0566 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-96 KSC Photo IndexNext Image KSC-99PP-0567


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)