At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Assembly Building, the STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform, still atop the crawler transporter, at Launch Pad 39B. To its left is the Fixed Service Structure that provides access to the orbiter and the Rotating Service Structure. Above it is the 80-foot fiberglass lightning mast which provides protection from lightning strikes. This view shows the Atlantic Ocean beyond the shuttle, to the east. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. (Photo Release Date: 09/21/98 )

KSC-98EC-1108 - Raw ASCII Text Caption file
KSC-98EC-1108 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-98EC-1108 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-98EC-1108 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-95 KSC Photo IndexNext Image KSC-98EC-1109


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)