With the Rotating Service Structure (RSS) rolled back, at left, the Space Shuttle Columbia is nearly ready for launch of STS-90. Rollback of the RSS is a major preflight milestone, typically occurring during the T-11-hour hold on L-1 (the day before launch). The scheduled launch of Columbia on Apr. 16 from Launch Pad 39B was postponed 24 hours due to difficulty with network signal processor No. 2 on the orbiter. This device formats data and voice communications between the ground and the Space Shuttle. The unit, which is located in the orbiter's mid-deck, will be removed and replaced. Prior to launch, one of the final steps will be to load the external tank with approximately 500,000 gallons of liquid hydrogen and liquid oxygen for fueling the orbiters three main engines. Tanking had not yet begun when the launch scheduled for Apr. 16 was scrubbed. STS-90 is slated to be the launch of Neurolab, a nearly 17-day mission to examine the effects of spaceflight on the brain, spinal cord, peripheral nerves and sensory organs in the human body. (Photo Release Date: 04/15/98 )

KSC-98EC-0483 - Raw ASCII Text Caption file
KSC-98EC-0483 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-98EC-0483 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-98EC-0483 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-90 KSC Photo IndexNext Image KSC-98EC-0484


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)