Workers in the Payload Changeout Room (PCR) at Launch Pad 39A are preparing to close the payload doors for flight on the Space Shuttle Atlantis, targeted for liftoff on Mission STS-79 around September 12. The SPACEHAB Double Module located in the aft area of the payload bay is filled with supplies that will be transferred to the Russian Space Station Mir. STS-79 marks the second flight of a SPACEHAB in support of the Shuttle-Mir dockings, and the first flight of the double-module configuration. The SPACEHAB is connected by tunnel to the Orbiter Docking System (ODS), with the Androgynous Peripheral Docking System (APDS) clearly visible on top of the ODS. The APDS provides the docking interface for the linkup with Mir, while the ODS provides a passageway from the orbiter to the Russian space station and the SPACEHAB. (Photo Release Date: 08/22/96 )

KSC-96EC-1004 - Raw ASCII Text Caption file
KSC-96EC-1004 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-96EC-1004 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-96EC-1004 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-79 KSC Photo IndexNext Image KSC-96EC-1005


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)