Workers at Launch Pad 39A are preparing to close the payload bay doors on the Space Shuttle Atlantis for its upcoming launch on Mission STS-74 and the second docking with the Russian Space Station Mir. Uppermost in the payload bay is the Orbiter Docking System (ODS), which also flew on the first docking flight between the Space Shuttle and MIR. Lowermost is the primary payload of STS-74, the Russian-built Docking Module. During the mission, the Docking Module will first be attached to ODS and then to Mir. It will be left attached to Mir to become a permanent extension that will afford adequate clearance between the orbiter and the station during future dockings. At left in the payload bay, looking like a very long pole, is the Canadian-built Remote Manipulator System arm that will be used by the crew to hoist the Docking Module and attach it to the ODS. (Photo Release Date: 11/02/95 )

KSC-95EC-1614 - Raw ASCII Text Caption file
KSC-95EC-1614 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-95EC-1614 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-95EC-1614 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-74 KSC Photo IndexNext Image KSC-95EC-1615


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)