KENNEDY SPACE CENTER, FLA. - STS-112 Mission Specialist Sandra Magnus (left) sits in the slidewire basket basket on the 195-foot level of the Fixed Service Structure, Launch Pad 39B, while Mission Specialist Piers Sellers (right) reaches for the release lever. They and the rest of the crew are practicing emergency egress from the pad during Terminal Countdown Demonstration Test activities. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. (Photo Release Date: 09/18/2002 )

KSC-02PD-1356 - Raw ASCII Text Caption file
KSC-02PD-1356 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-02PD-1356 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-02PD-1356 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-112 KSC Photo IndexNext Image KSC-02PD-1357


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)