KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour arrives at Launch Pad 39A shortly after 9 a.m. to begin processing operations for launch on mission STS-111. The slow journey along the crawlerway took 6.5 hours at a speed of 0.9 mph. The Shuttle sits atop its Mobile Launcher Platform, which travels on the crawler-transporter. At left is the open Rotating Service Structure and the Fixed Service Structure behind it, with its 80-foot lightning mast on top. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002. (Photo Release Date: 04/29/02 )

KSC-02PD-0587 - Raw ASCII Text Caption file
KSC-02PD-0587 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-02PD-0587 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-02PD-0587 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-111 KSC Photo IndexNext Image KSC-02PD-0588


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)