A wide-angle view of the Space Shuttle Atlantis as it stands ready inside the Vehicle Assembly Building for rollout to Launch Pad 39A. It sits on top of a Mobile Launcher Platform (MLP), a two-story steel structure 25 feet high, which supports and restrains the Shuttle during assembly, transit and while at the pad. The MLP weighs 8.23 million pounds. The entire configuration of Shuttle plus MLP is moved to the pad aboard a crawler-transporter. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda. (Photo Release Date: 03/25/2000 )

KSC-00PP-0403 - Raw ASCII Text Caption file
KSC-00PP-0403 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-00PP-0403 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-00PP-0403 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-101 KSC Photo IndexNext Image KSC-00PP-0404


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)