Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106. (Photo Release Date: 08/14/2000 )

KSC-00PP-1120 - Raw ASCII Text Caption file
KSC-00PP-1120 - Low (GIF Format, 320x240 pixels x 256 colors, approx 50 Kbytes)
KSC-00PP-1120 - Medium (JPEG format, 1024x768 pixels x 256 colors, approx 250 Kbytes)
KSC-00PP-1120 - High (JPEG, 2040x2640 pixels x 16 million colors, approx 400 Kbytes)

STS-106 KSC Photo IndexNext Image KSC-00PP-1121


DISCLAIMER: No copyright protection is asserted for these photographs.

If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA of a commercial product. These photographs are available for preview and download in electronic digital form ONLY. They may not be ordered from NASA in photograph form. (See NASA Copyright Notice)